For specific project detail, please click on individual titles on the right.


Brent Civic Centre

Sub and Superstructure Concrete Package for the Construction of a New Civic Centre for the London Borough of Brent consisting



Westfield Shopping Centre

A builders work package consisting of propping existing metal deck slabs, cutting and breaking out existing floors including all necessary



Witanhurst House, Highgate

Construction of a new basement adjacent to the existing Witanhurst House constructed by a “top down” form of construction inside



Bermondsey Spa

Combined Sub and Superstructure Package consisting of Pile Attendance, Bulk Excavation, (14,000 m3) Below Ground Drainage, Basement Construction with Post



St. Barts Phase 2

Phase 2 of the St. Barts Hospital rebuild consisting of Bulk Excavation, Pile Attendance, Pile Cap Construction, Below Ground Drainage,



Essex Schools

Scope of works for the Essex Schools BSF project consist of the following: Groundworks including foundations and below ground drainage.
Insitu



Former Colindale Hospital

Scope of works for the Former Colindale Hospital development consist of the following:
 
Groundworks including foundations and ground floor



Brighton AMEX

Scope of works for the New AMEX building included enabling works and installation of the capping beam. New AMEX Building Client: Sir



Parkway Newbury

Mitchellson are providing ground works and reinforced concrete sub structures and superstructures for this prestigious new shopping centre in the



National Maritime Museum

This project at the centre of Greenwhich comprises of a new build extension and part refurb to the existing museum



Athletes Village N10

Construction of the ground works and sub structure for this high profile, new residential development. Works included all survey and



Athletes Village N14

Construction of the ground works and sub structure for this high profile, new residential development. Works included all survey and



Raynes Park

Mitchellson provided bulk excavation, ground works, reinforced concrete sub & superstructure for this retail and residential development which is adjacent



Athletes Village N07

Block N07 forms part of the 2012 Olympic games legacy, initially the buildings are to be used to house the



Athletes Village N09

Construction of the ground works and sub structure for this high profile new residential development. The works include; all survey



Kings Cross Station - Package 6

Mitchellson Rail Limited works for this project include; reduced level dig, breakdown pile, construction of pile caps and ground beams,



Project Kimberley

Project Kimberley is a new Call Centre Building where Mitchellson has provided ground works and reinforced concrete sub & superstructure. Project



Reading Central

Reading Central is a 13 storey office block in the middle of Reading Town Centre. Mitchellson provided 50 metre high



Bury St. Edmunds

The new shopping centre at Bury St. Edmunds is the focal point of this historic town. The Shopping centre is



Walbrook

The Walbrook is situated in the heart of the city of London, a huge inner city development covering some 4,500



Harefield Academy

Works to commence for the Harefield Academy Project consist of; Enabling Works such as removal of trees and school faciliaties,



St. Barts Hospital

St. Bart’s Hospital is a 3 phase reconstruction where works had to commence around a working hospital. The substructure comprises



Mountbatten Centre, Southampton University

Mitchellson provided reinforced concrete superstructure for laboratory and office building on the University of Southampton Campus. There is double storey



Westminster College, Battersea

A new residential development and refurbishment of the existing Grade 2 Listed building. The build consisted of a secant piled



Stansted Raddison Hotel

RC frame for a 500 bedroomed hotel.  With a large input into the design of the concrete frame Mitchellson were



Lawn Tennis Association Training Facility

Visual Concrete Design Lawn Tennis Association Training Facility Client: ISG Value: £1,500,000 Programme: Location: Roehampton  



Mill Harbour

This residential build consisted of four climbing RC cores, rising sixteen floors above the basement.  Simultaneous construction of a two



Tally Ho

This island site consists of five levels of retail, leisure and theatre space, external temporary works and sixteen storey’s of