Brent Civic Centre
Sub and Superstructure Concrete Package for the Construction of a New Civic Centre for the London Borough of Brent consisting
Westfield Shopping Centre
A builders work package consisting of propping existing metal deck slabs, cutting and breaking out existing floors including all necessary
Witanhurst House, Highgate
Construction of a new basement adjacent to the existing Witanhurst House constructed by a “top down” form of construction inside
Bermondsey Spa
Combined Sub and Superstructure Package consisting of Pile Attendance, Bulk Excavation, (14,000 m3) Below Ground Drainage, Basement Construction with Post
St. Barts Phase 2
Phase 2 of the St. Barts Hospital rebuild consisting of Bulk Excavation, Pile Attendance, Pile Cap Construction, Below Ground Drainage,
Essex Schools
Scope of works for the Essex Schools BSF project consist of the following:
Groundworks including foundations and below ground drainage.
Insitu
Former Colindale Hospital
Scope of works for the Former Colindale Hospital development consist of the following:
Groundworks including foundations and ground floor
Brighton AMEX
Scope of works for the New AMEX building included enabling works and installation of the capping beam. New AMEX Building Client: Sir
Parkway Newbury
Mitchellson are providing ground works and reinforced concrete sub structures and superstructures for this prestigious new shopping centre in the
National Maritime Museum
This project at the centre of Greenwhich comprises of a new build extension and part refurb to the existing museum
Athletes Village N10
Construction of the ground works and sub structure for this high profile, new residential development. Works included all survey and
Athletes Village N14
Construction of the ground works and sub structure for this high profile, new residential development. Works included all survey and
Raynes Park
Mitchellson provided bulk excavation, ground works, reinforced concrete sub & superstructure for this retail and residential development which is adjacent
Athletes Village N07
Block N07 forms part of the 2012 Olympic games legacy, initially the buildings are to be used to house the
Athletes Village N09
Construction of the ground works and sub structure for this high profile new residential development. The works include; all survey
Kings Cross Station - Package 6
Mitchellson Rail Limited works for this project include; reduced level dig, breakdown pile, construction of pile caps and ground beams,
Project Kimberley
Project Kimberley is a new Call Centre Building where Mitchellson has provided ground works and reinforced concrete sub & superstructure. Project
Reading Central
Reading Central is a 13 storey office block in the middle of Reading Town Centre. Mitchellson provided 50 metre high
Bury St. Edmunds
The new shopping centre at Bury St. Edmunds is the focal point of this historic town. The Shopping centre is
Walbrook
The Walbrook is situated in the heart of the city of London, a huge inner city development covering some 4,500
Harefield Academy
Works to commence for the Harefield Academy Project consist of; Enabling Works such as removal of trees and school faciliaties,
St. Barts Hospital
St. Bart’s Hospital is a 3 phase reconstruction where works had to commence around a working hospital. The substructure comprises
Mountbatten Centre, Southampton University
Mitchellson provided reinforced concrete superstructure for laboratory and office building on the University of Southampton Campus. There is double storey
Westminster College, Battersea
A new residential development and refurbishment of the existing Grade 2 Listed building. The build consisted of a secant piled
Stansted Raddison Hotel
RC frame for a 500 bedroomed hotel. With a large input into the design of the concrete frame Mitchellson were
Lawn Tennis Association Training Facility
Visual Concrete Design Lawn Tennis Association Training Facility Client: ISG Value: £1,500,000 Programme: Location: Roehampton
Mill Harbour
This residential build consisted of four climbing RC cores, rising sixteen floors above the basement. Simultaneous construction of a two
Tally Ho
This island site consists of five levels of retail, leisure and theatre space, external temporary works and sixteen storey’s of