We are delighted to announce that we will be working with  Sir Robert McAlpine on the Twin Tower Residential Development, Morello II.

Project:           Morello II Croydon
Client:
            Sir Robert McAlpine
Value:
             £17,000,000
Programme:
   76 Weeks
Role:   
Subcontractor
Substructure:

  • Enabling works & pile attendance
  • Foundation & pile cap construction
  • Sewer diversion & below ground drainage network
  • Soakaway attenuation tanks
  • Watertight ground floor slab

Superstructures:

  • 25 storey Reinforced Concrete frames with slipform cores
  • 8 storey Reinforced Concrete frame with traditional RC cores
  • Precast concrete stairs – installed during slipform construction
  • Coordination and installation of protection screens to RC towers due to proximity to railway & road

We have secured a £17m deal to deliver foundations and concrete frame for two 25-storey residential towers in Croydon.

A total of 338 flats will be built in the two towers, with a further 118 flats for shared ownership and social rent built in an adjacent 9-storey stepped complex called Cherry Orchard Gardens.

The Morello Estate project will also include 20,000 sq ft of retail and commercial floor space, new public realm and a new link bridge to East Croydon train station.


Check out all the details in the Construction Enquirer Article
👇🏻 👇🏻 👇🏻 👇🏻