Mitchellson provided ground works and reinforced concrete sub structures and superstructures for this new shopping centre and basement car park.

Works comprised of:

  • 600m of capping beam construction
  • 38,000m3 of bulk excavation
  • Design and Installation of temporary works, to permit double basement construction.
  • Construction of fully waterproof Basement some 6m below the Water Table.
  • 12,000m2 suspended Carpark basement slabs
  • 4 Independent concrete core superstructures and concrete topping to steel frame superstructure for Retail and Residential Units

Substructure:

Basement Excavation (90,000m3)

Basement Construction

Extensive Temporary Works

Waterproof Substructure

Superstructure:

Insitu Concrete Frame

9 Jumpform Cores

Topping to Metal Decking