50,000m2 of prime retail and office accommodation.
Mitchellson carried out extensive substructure works including:
- Demolition
- Reduced level of excavation
- ‘Top down’ construction
- Excavation up to 20m in depth
- Large perimeter capping beam
- Large circular steel temporary works
- Foundations comprising of large pile caps and suspended slabs
- Core Pile Caps