50,000m2 of prime retail and office accommodation.

Mitchellson carried out extensive substructure works including:

  • Demolition
  • Reduced level of excavation
  • ‘Top down’ construction
  • Excavation up to 20m in depth
  • Large perimeter capping beam
  • Large circular steel temporary works
  • Foundations comprising of large pile caps and suspended slabs
  • Core Pile Caps